Limits

This page lists the known limitations for Integration Connectors.

Integration Connectors enforces the following usage limits. You are responsible for tracking and ensuring that the values stay within the prescribed limits.

Resource
Limit
Value
All connections
Maximum number of connections per region
50
Maximum number of nodes per connection
100
Maximum payload size supported by the Connectors task in Application Integration
10 MB
Locations
You can use a maximum of 20 unique locations to configure all your connections. For example, if you have created 20 connections where each connection uses a different location, you can't create a new 21st connection in a different location. The new connection must use any one of your 20 locations that you are already using.
N/A
Design a Mobile Site
View Site in Mobile | Classic
Share by: