(EP抜粋) PROCESS VALIDATION General 20. The requirements and principles outlined in this chapter are applicable to the manufacture of pharmaceutical dosage forms. They cover the initial validation of new processes, subsequent validation of modified processes and re-validation. 21. Process validation should normally be completed prior to the distribution and sale of the medicinal product (prospective validation). In exceptional circumstances, where this is not possible, it may be necessary to validate processes during routine production (concurrent validation). Processes in use for some time should also be validated (retrospective validation). 22. Facilities, systems and equipment to be used should have been qualified and analytical testing methods should be validated. Staff taking part in the validation work should have been appropriately trained. 23. Facilities, systems, equipment and processes should be periodically evaluated to verify that they are still operating in a valid manner.
Prospective validation 24. Prospective validation should include, but not be limited to the following: (a) short description of the process; (b) summary of the critical processing steps to be investigated; (c) list of the equipment/facilities to be used (including measuring/ monitoring/recording equipment) together with its calibration status (d) finished product specifications for release; (e) list of analytical methods, as appropriate; (f) proposed in-process controls with acceptance criteria; (g) additional testing to be carried out, with acceptance criteria and analytical validation, as appropriate; (h) sampling plan; 7 (i) methods for recording and evaluating results (j) functions and responsibilities; (k) proposed timetable. 25. Using this defined process (including specified components) a series of batches of the final product may be produced under routine conditions. In theory the number of process runs carried out and observations made should be sufficient to allow the normal extent of variation and trends to be established and to provide sufficient data for evaluation. It is generally considered acceptable that three consecutive batches/runs within the finally agreed parameters, would constitute a validation of the process. 26. Batches made for process validation should be the same size as the intended industrial scale batches. 27. If it is intended that validation batches be sold or supplied, the conditions under which they are produced should comply fully with the requirements of Good Manufacturing Practice, including the satisfactory outcome of the validation exercise, and with the marketing authorisation.
Concurrent validation 28. In exceptional circumstances it may be acceptable not to complete a validation programme before routine production starts. 29. The decision to carry out concurrent validation must be justified, documented and approved by authorised personnel. 30. Documentation requirements for concurrent validation are the same as specified for prospective validation.
Retrospective validation 31. Retrospective validation is only acceptable for well-established processes and will be inappropriate where there have been recent changes in the composition of the product, operating procedures or equipment. 32. Validation of such processes should be based on historical data. The steps involved require the preparation of a specific protocol and the reporting of the results of the data review, leading to a conclusion and a recommendation. 33. The source of data for this validation should include, but not be limited to batch processing and packaging records, process control charts, maintenance 8 log books, records of personnel changes, process capability studies, finished product data, including trend cards and storage stability results. 34. Batches selected for retrospective validation should be representative of all batches made during the review period, including any batches that failed to meet specifications, and should be sufficient in number to demonstrate process consistency. Additional testing of retained samples may be needed to obtain the necessary amount or type of data to retrospectively validate the process. 35. For retrospective validation, generally data from ten to thirty consecutive batches should be examined to assess process consistency, but fewer batches may be examined if justified.