Yahoo
In this photo here the wall in the background has been taped and muddied before a hand trial texture was applied.
Walls were painted after the drywall repairs and texture was finished walls only.
In this photo is the final phase and this would be hand trial texture.
In this picture the left wall is halfway textured after the photo the other half the bottom was finished right after.
Small cracks on each corner.
On Point Drywall & Construction Drywall Finishes

On Time and Always OnPoint from start to finish.

Phone: (405) 406-4218

Cross Streets: Between Bomber Cir and Renny Rd

Interested in our services?

Closed now

  • Sun Closed

3500 S Douglas Blvd, Ste 43 Oklahoma City, OK 73150 ·1009.00 mi

Is this your business? Verify your listing

Advertisement
Mobilize your Website
View Site in Mobile | Classic
Share by: