Building this pool cover box correctly was too much for Diamond Quality Pools. Their lawyer says it is my fault they built it crooked.
We call these the
Diamond Quality Pools says this is 90% complete.   Lots of prep left to do before installing tile and plaster.  Maybe 25% complete?
Diamond Quality Pools Contractor

Shoreline, WA 98133 ·2275.79 mi

Is this your business? Verify your listing

Reviews

yelp
1.0 1 reviews
5 star
0 4 star
0 3 star
0 2 star
0 1 star
1
A M. 06/22/23

Tile, coping, and re-plastering was supposed to take 3-4 weeks. After 5 months, during which they only arrived to work for a few days at a time in short spurts, very little progress had been...