Reference documentation and code samples for the Google Cloud OsConfig V1 Client class WeekDayOfMonth.
Represents one week day in a month. An example is "the 4th Sunday".
Generated from protobuf message google.cloud.osconfig.v1.WeekDayOfMonth
Methods
__construct
Constructor.
data
array
Optional. Data for populating the Message object.
↳ week_ordinal
int
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
↳ day_of_week
int
Required. A day of the week.
↳ day_offset
int
Optional. Represents the number of days before or after the given week day of month that the patch deployment is scheduled for. For example if week_ordinal
and day_of_week
values point to the second day of the month and this day_offset
value is set to 3
, the patch deployment takes place three days after the second Tuesday of the month. If this value is negative, for example -5, the patches are deployed five days before before the second Tuesday of the month. Allowed values are in range [-30, 30].
getWeekOrdinal
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
int
setWeekOrdinal
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
var
int
$this
getDayOfWeek
Required. A day of the week.
int
setDayOfWeek
Required. A day of the week.
var
int
$this
getDayOffset
Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if week_ordinal
and day_of_week
values point to the second day of the
month and this day_offset
value is set to 3
, the patch deployment takes
place three days after the second Tuesday of the month. If this value is
negative, for example -5, the patches are deployed five days before before
the second Tuesday of the month. Allowed values are in range [-30, 30].
int
setDayOffset
Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if week_ordinal
and day_of_week
values point to the second day of the
month and this day_offset
value is set to 3
, the patch deployment takes
place three days after the second Tuesday of the month. If this value is
negative, for example -5, the patches are deployed five days before before
the second Tuesday of the month. Allowed values are in range [-30, 30].
var
int
$this