----- The flooring was damaged a lot, so I changed the flooring from November 24th to November 27th. Initially, it was scheduled for November 24th to December 1st, but unexpectedly it went smoothly and ended on November 27th. The flooring board seemed to be 2mm thicker than before due to the soundproofing effect, and the craftsmen had a hard time. As for this, we kept everything in the living room and corridor in a Japanese-style room, and spent time in our room during the construction. It seems that some contractors ask to vacate the house, but this time I was asked to do the construction while living. Although it was inconvenient. The bath, toilet and flooring are now clean and comfortable. I had to get the renovating consent form from the households on the next and lower floors and submit it to the management company, and I had to go to get the signature and stamp late at night, but all the construction was done very well. Was good.