[an error occurred while processing this directive]
(Click
Message to Learn More)
Columns
- VAV Diffusers, Packaged Rooftop Units, and BAS
A “newish” concept comes out for public bid
- Client
Relations – Revisited (Two of Two)
Final (?) words of
wisdom
- Client Relations
– Revisited (One of Two) More words of wisdom.
- The Transfer of Information
From one place to another…
- AHR Expo 2015 – Trends and Products
Part Two - Products
- AHR Expo 2015 – Trends and Products
Part One - Trends
- AHR Expo Rolls into Chicago
Biggest Show Ever
- The Importance of Lists
Part Four - Field Surveys continued
- The
Importance of Lists - Part Three
This month I share my thoughts on
field surveys.
- Plans &
Specifications – A Primer
Part Two - The Specs
- Plans & Specifications – A Primer
Part One – The Plans
- Operator Error
Overriding the BAS
- The Importance of Mechanical Details
The devil is in the details
- Plans &
Specifications
Inconsistencies
Between and Within
- The Business of HVAC Controls
A good place to be after all.
- The
Importance of Lists
Part Two - Another list for another
“process”.
- The Importance of Lists
Part One - What’s your List Tool?
- Final Collection of Short Stories
The last batch
- Still Another Collection of Short Stories
Back to the well
- Multizone AHU Retrofit Strategies
Breathing new life into an old beast.
- Yet Another
Collection of Short Stories
Keepin’ them coming
- Ten
Innovations
That Made Life Easier in the HVAC Controls Biz
- Part
Two of Two
- Ten Innovations
That Made Life Easier in the HVAC Controls Biz
- And Another
Collection of Short Stories
An ongoing series of tales told and lessons learned.
- New Trends and
Products in HVAC Control (Part Two)
Continuation from fall
2012 column
- Another Collection of Short Stories
I
present here the next installment of an ongoing periodic series of
short stories pertinent to the HVAC / BAS business.
- Who’s That Knockin’ On My Pipes?
Hot water reset control to the rescue
- Client Relations – Part Two
Five more from the well.
- Client Relations
– Part One
Sometimes it’s the little things that make a difference
- Thermostat Wars
Hostilities on the home front
- The Evolution of Electronic Controls
- Part Two And then came DDC
- The Evolution of Electronic Controls
– Part One From prehistory to the present-day
- Metering: The Hows & The Whys
Campus-wide metering project pays dividends
- New Trends and Products in HVAC Control
Unheard of just a few short years ago
- Ladder Diagrams vs. Point-to-point Wiring Diagrams
The basics of electrical design and construction
- Back to
Basics – Part Three
A collection of short stories
- Back to
Basics – Part Two
A crash course in the
concepts of HVAC control
- Back to Basics – Part One
The fundamentals
- Twenty Years of Controls Contracting
From pneumatics to wireless, and everything in between.
- Basic Control System Troubleshooting
More tips from Craig
- My Sensor’s Not Working!
Tips on how to troubleshoot a problem
- AHR Expo is Back in Town
My kind of town, Chicago is…
- Trends in HVAC Control
And bucking the trends via the BAS…?
- Cutting Corners In Control Systems Design & Installation
Half the cost, twice the problems -
Half the cost, twice the problems
- BAS Interface Methods
to Packaged Equipment
Can We Talk?
- Gas
Detection
(2 of 2)
Technologies & Applications
- Gas Detection (1 of
2)
Always
check to see the guidelines that any
particular municipality follows, or solicit the advice of your “local
expert”!
- Two
Decades of Advancements in HVAC Control
Twenty years doesn’t seem that long
- Terminal
Units Primer
Select the appropriate digital controller to fit
the application
- Wireless
In HVAC Controls
We’ve come a long way, baby!
- Controls
Devices (3 of 3)
Rules of thumb to follow for TC
installation & design
- Controls
Devices (Part 2 of 3)
Rules of thumb to follow for TC installation & design
- Controls
Devices
(Part 1 of 3) Rules
of thumb to follow for TC installation & design
- Systems
& Sequences
Waterside systems
Part 2 of 2
- Systems
&
Sequences
Airside systems
Part 1 of 2
- Control
System
Upgrades
Determine
your best path to a total
system overhaul
- Hydronic
Zone Controls 101
Control theory as explained through real-life
experience
- VFD
Retrofit Opportunities
Variable frequency drive opportunities
abound!
- Obtaining LEED
Credits With Controls
What can we do to make our
facility greener?
- The Saga of
Westlake Condominiums
Never
underestimate the importance of clear, honest, open, and continuous
communication
- Controls
Contracting Operations: Closeout
The final steps to the
completion of a successful project Part 3 of 3
- Controls
Contracting Operations - Installation
Getting from point A to
point B, successfully! Part 2/3
- Controls
Contracting - Operations: Preconstruction
What it takes to
get the job…started! Part 1/3
- Retrofit
Strategies
What can I do to make my building more efficient?
- Common Routines
in DDC
The keys to
optimization are within your reach Part 2 of 2
- Common Routines
in DDC
Let the system work
for you!
Part
1 of 2
- Understanding
Specifications (3 of 3)
“The devil is in the details”
- Understanding
Specifications (Part 2 of 3)
Parts is parts, so they say
- Understanding
Specifications (1 of 3)
A breakdown of your typical temperature
controls spec
- Airflow Monitoring
Techniques and
technologies: the basics for beginners
- BAS Graphics
Take a virtual tour of your building’s mechanical
systems
- Selecting
Sensors for BAS
A tutorial on choosing the right temperature
sensor for the right job
- Points
List Primer
A “pointed” view of hardwired I/O
- What’s New!
From This Year’s AHR Expo
Green, IAQ, BACnet, Demand
Response, Wireless, to name just a few.
- AHR
Expo Blows Through the Windy City
A local guy’s experiences at the
Big Show
- Control Valves
– Sizing & Selection
A
refresher on choosing the right valve for the right application
- Discussion
on Descriptors
Commanding
and confirming the operation of two-state devices
- Cabling for DDC
Systems
Specify the proper conductor sizes and cable types
for your BAS project
- Sequences
of Operation
An objective look at specified descriptions of
control
Part 2 of
2
- Sequences of
Operation
An
objective look at specified descriptions of control Part 1 of 2
- Programming
Methods
A historical view as
seen from one perspective
- Anatomy of a Typical BAS
Analysis of a hypothetical commercial office
building DDC system
- Words of Wisdom
Prudent advice from the pages of Practical Controls
- Unitary
Controllers Primer
Typical applications utilizing unit (zone) level control
Part 2 of 3
- Controls
Estimating 101
A beginner’s look at labor and material
estimating for plan & spec projects
- Typical
Controllers in DDC
Understand the
differences in controller types and applications
Part 1 of 3
- How Safety
Devices (Should?) Affect System Components
Simple, albeit
important, rules of thumb regarding equipment failsafe modes
- RTU Zoning
Systems
Getting more out of your single zone constant volume
rooftop units
- [an error occurred while processing this directive]
Short on I/O?
Try This Out!
Tricks of the trade,
time-tested and industry-accepted
- Wiring For
Combustion Air
Prove the presence of
the combustion air source before
allowing the boiler plant to
operate
- Terms &
Terminologies – Avoiding Confusion
A closer look at
some of the words and phrases that we sometimes take for granted
- Electric Duct
Heaters – Application & Control
Avoid application errors and
controllability issues when designing EDH control systems
- Pressure
Transmitters – Selection & Placement
Understand the concepts behind sizing and
locating static and differential pressure transmitters
- Rooftop Unit
Economizer – Operation & Control
Perform the economizer
functions of a packaged rooftop unit using digital control
- RTU Operation
Via Conventional & Digital Controls
Control a packaged rooftop unit with a
thermostat, or digitally via a building automation system
- Interlocking
of AHU Safety Devices
Design and fabricate
a control panel specifically for the safety device interlocking.
Professional
Information
Steve Calabrese
attended the University of Illinois at Chicago (UIC) and graduated in
1990 with a B.S. degree in electrical engineering. He began his HVAC
career as a design engineer at Air Comfort Corporation, a family-owned
mechanical services company. In 1993, Steve went to work for Midwest
Mechanical Construction Company, a large, full service mechanical
contractor serving the greater Chicagoland area. During his eleven
years there, Steve migrated through various roles as mechanical systems
designer, control systems engineer, controls group manager, and
engineering manager.
In 2003 Steve’s book, Practical
Controls: A Guide to Mechanical Systems
, was published.
Steve brings his mechanical contracting experiences to this writing,
and offers practical approaches to control systems issues.
In 2004 Steve left the mechanical contracting end
of the industry to go to work for what is now Chicagoland’s branch
office of Automated Logic Corporation
.
As a project manager, Steve’s day-to-day operations included
engineering and estimating, control systems design and consultation,
parts selection and procurement, installation management and field
supervision, startup and commissioning support, and project fiscal and
schedule management.
In 2008, Steve joined
Control
Engineering Corp.
as a sales engineer, and is currently bidding projects in the
retrofit/negotiated work markets, as well as the plan/spec markets.
As a member of several professional associations,
Steve actively participates in local seminars and training endeavors.
He attributes his HVAC knowledge and expertise to working many years
for a mechanical contractor, and couples his broad mechanical knowledge
and experience with a strong background in the area of electricity and
electronics. You can visit his website at
www.pcs-engineering.com
[an error occurred while processing this directive]
[Click Banner To
Learn More]
[Home Page]
[The
Automator]
[About]
[
Subscribe
]
[Contact
Us]