Yahoo
This is a paid press release. Contact the press release distributor directly with any inquiries.

Thunder Gold Reports 411.0 Metres Averaging 0.514 g/t Au and Awards Magnetotellurics Airborne Survey of Tower Mountain

Thunder Bay, Ontario--(Newsfile Corp. - October 13, 2026) - Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25) (OTCQB: TGOLF) (" Thunder Gold" or the " Company") is pleased to announce the following infill diamond drill results from the Bench Target, at the Company's flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario.

Highlights:

  • TM25-186X extended TM25-186 252.0 metres, delivering a combined intersection of 411.0 metres averaging 0.514 g/t Au;

  • TM25-186/186X intersected semi-continuous mineralization from collar to 90 metres and continuous gold mineralization to the end-of-hole at 501.0 metres;

  • TM25-186X terminated in mineralization intersecting 19.5 metres averaging 0.523 g/t Au; and,

  • The Company has contracted Expert Geophysics Surveys Inc., Newmarket, Ontario, to complete a 285 line-kilometre airborne Mobile MT ("MagnetoTellurics") survey over the Tower Mountain Intrusive Complex.

TM25-186/186X was drilled from east to west across the main Bench-3738-Ellen (" B-E") trend (Reference Table 1.0 and Figure 1.0).

Wes Hanson, President and CEO states, "TM25-186X, drilled sub-parallel to the northern B-E contact, intersected consistent, gold grades over the entire 252-metre extension as expected, with 86% of the results assaying greater than 0.10 g/t Au. TM25-186X exceeded the model predicted grade by 18% (Reference Figure 3.0). Collectively, the eight infill holes completed to date indicate a net positive grade correlation to the January 9, 2026, Mineral Resource Estimate. The results to date continue to suggest strong, sub-vertical continuity which remains open at depth. The results also suggest average gold grade is increasing as we delve deeper into the system and site geologists are noting visible chalcopyrite at depth as well."

"MagnetoTellurics (" MT ") is a natural-source resistivity survey with a greater than 1.0-kilometre depth of investigation. It is often deployed to map alteration in porphyry copper-gold systems with useful resolution as deep as 2.0 kilometres. We believe that the MT survey may clarify alteration changes at depth, improving drill targeting as we look to test the core of the Tower Mountain system, especially as gold grades appear to be increasing with depth and we are seeing an increase in chalcopyrite, as we drill deeper into the system. The MT survey results are expected by mid-November, coincident with the final drill holes planned for the 2026 filed season."

Table 1.0 provides the location and orientation of TM25-186X.

Figure 1.0 is a plan view showing the location of the drill holes reported in this news release.

Table 1.0 - B-E Target - Drill Hole Location Bearing and Dip

Hole ID

Easting

Northing

Elevation

Bearing

Dip

TD

TM25-186X

300750.8

5377608

262.247

99.5

-44.8

252

Figure 1.0 Bench Target Diamond Drill Plan - October 13, 2026

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/318446_c4bbdc5344547afe_001full.jpg

TM25-186/186X

TM25-186 was originally drilled and reported in 2025. TM25-186X extended the original hole 252.0 metres. The combined hole parallels the northern B-E Target contact (Reference Figure 1.0). TM26-186X targeted inferred resource blocks within the optimized pit limit constraining the current MRE.

TM25-186/186X is positioned approximately 125 metres vertically above TM26-210 - 115 metres averaging 0.67 g/t Auand 250 metres below TM26-218 - 99.0m averaging 0.352 g/t Au(Reference Figure 2.0).

TM25-186/186X is mineralized from surface to the end of the hole. Table 2.0 summarizes the significant results and Table 3.0 presents the individual assays from the collar to the end-of-hole. TM25-186X intersected two narrow intervals of barren to low grade gold values over continuous down-hole intervals up to 12.0 metres in length. Otherwise, the hole is consistently mineralized from the collar to the end of the extension.

TM26-186X is the first hole where the interpreted B-E Target contact was not intersected where interpreted. The hole remained in mineralization for a horizontal distance of approximately 75 metres beyond the previously interpreted contact.

Due to the alignment and the fact that TM25-186X failed to exit the mineralization, true width cannot be estimated for this hole.

Table 2.0 - TM25-186/186X Significant Results

Hole ID

From
(m)

To
(m)

Length
(m)

Grade
(Au g/t)

True
Width
(m)

TM25-186

3.0

501.0

498.0

0.440

Unknown

includes

10.5

33.0

22.5

0.178

Unknown

and

90.0

501.0

411.0

0.513

Unknown

includes

90.0

249.0

159.0

0.627

Unknown

includes

90.0

94.5

4.5

0.879

Unknown

and

94.5

108.0

13.5

0.076

Unknown

and

108.0

123.0

15.0

1.654

Unknown

and

123.0

150.0

27.0

0.092

Unknown

and

150.0

186.0

36.0

0.322

Unknown

and

186.0

210.0

24.0

1.087

Unknown

and

210.0

222.0

12.0

0.341

Unknown

and

222.0

270.0

48.0

0.713

Unknown

includes

222.0

249.0

27.0

0.951

Unknown

TM25-186X

249.0

501.0

252.0

0.443

Unknown

includes

249.0

270.0

21.0

0.407

Unknown

and

270.0

307.5

37.5

0.258

Unknown

and

307.5

435.0

127.5

0.433

Unknown

and

435.0

468.0

33.0

0.785

Unknown

and

468.0

481.5

13.5

0.162

Unknown

and

481.5

501.0

19.5

0.523

Unknown

True Width cannot be estimated at this time due to lack of data

TM25-186/186X continues to suggest strong sub-vertical continuity within the B-E Target contacts. Both higher grade intervals internal to the contacts as well as barren, late mafic dikes exhibit sub-vertical continuity, essentially paralleling the interpreted contact of the Tower Mountain Intrusive Complex ("TMIC") at depth.

Figure 2.0 - Cross Section TM25-186X

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/318446_c4bbdc5344547afe_002full.jpg

MagnetoTellurics Airborne Survey

Expert Geophysics Surveys Inc. (" EGS") has been contracted to complete a Mobile Magnetotellurics (" MobileMT") airborne survey of the TMIC and the magnetic low halo surrounding the TMIC outward for at least 500 metres based on current airborne magnetic surveys. A total of 285-line kilometres, spaced 100 metres apart, shall be flown in an east-west orientation across the TMIC and the prospective halo mineralization.

Numerous case studies, largely from porphyry copper-gold deposits worldwide, suggest Mobile MT can effectively isolate resistivity variation to depths of up to 2.0 kilometres from surface. The Company believes that alteration effectively controls gold mineralization and alteration can be effectively mapped from resistivity response.

The proposed 285 line-kilometre Mobile MT is planned to be completed by October 31, 2026, with initial results available by November 15th, in advance of the final drill holes planned for the 2026 field season.

Table 3.0 -TM25-186/186X Complete Results

From
(m)

To
(m)

Au g/t

From
(m)

To
(m)

Au g/t

From
(m)

To
(m)

Au g/t

3.0

4.5

0.025

63.0

64.5

0.139

123.0

124.5

0.175

4.5

6.0

0.016

64.5

66.0

0.042

124.5

126.0

0.053

6.0

7.5

0.049

66.0

67.5

0.042

126.0

127.5

0.022

7.5

9.0

0.056

67.5

69.0

0.039

127.5

129.0

0.031

9.0

10.5

0.085

69.0

70.5

0.061

129.0

130.5

0.033

10.5

12.0

1.020

70.5

72.0

0.044

130.5

132.0

0.033

12.0

13.5

0.074

72.0

73.5

0.164

132.0

133.5

0.015

13.5

15.0

0.044

73.5

75.0

0.052

133.5

135.0

0.014

15.0

16.5

0.041

75.0

76.5

0.076

135.0

136.5

0.031

16.5

18.0

0.101

76.5

78.0

0.332

136.5

138.0

0.047

18.0

19.5

0.157

78.0

79.5

0.032

138.0

139.5

0.390

19.5

21.0

0.126

79.5

81.0

0.022

139.5

141.0

0.181

21.0

22.5

0.095

81.0

82.5

0.009

141.0

142.5

0.081

22.5

24.0

0.076

82.5

84.0

0.003

142.5

144.0

0.189

24.0

25.5

0.066

84.0

85.5

0.003

144.0

145.5

0.251

25.5

27.0

0.217

85.5

87.0

0.014

145.5

147.0

0.054

27.0

28.5

0.268

87.0

88.5

0.057

147.0

148.5

0.023

28.5

30.0

0.118

88.5

90.0

0.069

148.5

150.0

0.027

30.0

31.5

0.119

90.0

91.5

0.949

150.0

151.5

0.296

31.5

33.0

0.154

91.5

93.0

0.158

151.5

153.0

0.092

33.0

34.5

0.062

93.0

94.5

1.530

153.0

154.5

0.142

34.5

36.0

0.046

94.5

96.0

0.128

154.5

156.0

0.203

36.0

37.5

0.020

96.0

97.5

0.142

156.0

157.5

0.147

37.5

39.0

0.035

97.5

99.0

0.084

157.5

159.0

0.301

39.0

40.5

0.076

99.0

100.5

0.033

159.0

160.5

0.064

40.5

42.0

0.050

100.5

102.0

0.042

160.5

162.0

0.346

42.0

43.5

0.055

102.0

103.5

0.028

162.0

163.5

0.433

43.5

45.0

0.141

103.5

105.0

0.132

163.5

165.0

0.303

45.0

46.5

0.035

105.0

106.5

0.074

165.0

166.5

0.624

46.5

48.0

0.040

106.5

108.0

0.022

166.5

168.0

0.607

48.0

49.5

0.045

108.0

109.5

0.394

168.0

169.5

0.417

49.5

51.0

0.126

109.5

111.0

2.260

169.5

171.0

0.395

51.0

52.5

0.036

111.0

112.5

6.530

171.0

172.5

0.521

52.5

54.0

0.086

112.5

114.0

1.730

172.5

174.0

0.170

54.0

55.5

0.320

114.0

115.5

1.890

174.0

175.5

0.848

55.5

57.0

0.019

115.5

117.0

1.380

175.5

177.0

0.385

57.0

58.5

0.024

117.0

118.5

0.747

177.0

178.5

0.141

58.5

60.0

0.074

118.5

120.0

0.352

178.5

180.0

0.172

60.0

61.5

0.033

120.0

121.5

0.725

180.0

181.5

0.101

61.5

63.0

0.044

121.5

123.0

0.533

181.5

183.0

0.340

Table 3.0 -TM25-186/186X Complete Results (continued)

From
(m)

To
(m)

Au g/t

From
(m)

To
(m)

Au g/t

From
(m)

To
(m)

Au g/t

183.0

184.5

0.227

243.0

244.5

1.820

300.0

301.5

0.193

184.5

186.0

0.454

244.5

246.0

1.950

301.5

303.0

0.104

186.0

187.5

0.588

246.0

247.5

0.511

303.0

304.5

0.057

187.5

189.0

1.630

247.5

249.0

2.430

304.5

306.0

0.456

189.0

190.5

0.527

TM25-186X COLLAR

306.0

307.5

0.483

190.5

192.0

1.070

249.0

249.5

0.950

307.5

309.0

0.549

192.0

193.5

1.200

249.5

250.5

0.849

309.0

310.5

0.250

193.5

195.0

1.530

250.5

252.0

0.182

310.5

312.0

1.010

195.0

196.5

0.931

252.0

253.5

0.247

312.0

313.5

0.631

196.5

198.0

1.390

253.5

255.0

0.431

313.5

315.0

1.000

198.0

199.5

0.820

255.0

256.5

0.276

315.0

316.5

0.588

199.5

201.0

0.202

256.5

258.0

0.521

316.5

318.0

0.458

201.0

202.5

0.420

258.0

259.5

0.564

318.0

319.5

0.065

202.5

204.0

0.948

259.5

261.0

0.543

319.5

321.0

0.261

204.0

205.5

0.558

261.0

262.5

0.129

321.0

322.5

0.656

205.5

207.0

0.900

262.5

264.0

0.536

322.5

324.0

0.403

207.0

208.5

1.560

264.0

265.5

0.127

324.0

325.5

0.574

208.5

210.0

3.120

265.5

267.0

0.366

325.5

327.0

0.580

210.0

211.5

0.131

267.0

268.5

0.160

327.0

328.5

0.027

211.5

213.0

0.526

268.5

270.0

0.738

328.5

330.0

0.034

213.0

214.5

0.333

270.0

271.5

0.309

330.0

331.5

0.310

214.5

216.0

0.417

271.5

273.0

0.387

331.5

333.0

0.342

216.0

217.5

0.376

273.0

274.5

0.395

333.0

334.5

0.757

217.5

219.0

0.337

274.5

276.0

0.171

334.5

336.0

2.460

219.0

220.5

0.388

276.0

277.5

0.237

336.0

337.5

1.320

220.5

222.0

0.218

277.5

279.0

0.398

337.5

339.0

0.309

222.0

223.5

0.723

279.0

280.5

0.391

339.0

340.5

0.366

223.5

225.0

0.524

280.5

282.0

0.429

340.5

342.0

0.159

225.0

226.5

0.655

282.0

283.5

0.212

342.0

343.5

0.108

226.5

228.0

0.314

283.5

285.0

0.397

343.5

345.0

0.065

228.0

229.5

0.434

285.0

286.5

0.167

345.0

346.5

0.060

229.5

231.0

0.519

286.5

288.0

0.232

346.5

348.0

0.417

231.0

232.5

1.900

288.0

289.5

0.242

348.0

349.5

0.846

232.5

234.0

0.922

289.5

291.0

0.372

349.5

351.0

0.395

234.0

235.5

0.299

291.0

292.5

0.086

351.0

352.5

0.356

235.5

237.0

0.911

292.5

294.0

0.091

352.5

354.0

0.103

237.0

238.5

0.528

294.0

295.5

0.109

354.0

355.5

1.250

238.5

240.0

0.993

295.5

297.0

0.322

355.5

357.0

0.260

240.0

241.5

0.671

297.0

298.5

0.049

357.0

358.5

0.454

241.5

243.0

1.010

298.5

300.0

0.151

358.5

360.0

0.366

Table 3.0 -TM25-186X Complete Results (continued)

From
(m)

To
(m)

Au g/t

From
(m)

To
(m)

Au g/t

From
(m)

To
(m)

Au g/t

360.0

361.5

0.211

420.0

421.5

0.075

480.0

481.5

0.297

361.5

363.0

0.168

421.5

423.0

0.085

481.5

483.0

0.574

363.0

364.5

0.272

423.0

424.5

0.266

483.0

484.5

0.355

364.5

366.0

0.090

424.5

426.0

0.172

484.5

486.0

0.641

366.0

367.5

0.239

426.0

427.5

0.258

486.0

487.5

0.518

367.5

369.0

0.170

427.5

429.0

0.373

487.5

489.0

0.330

369.0

370.5

0.138

429.0

430.5

0.432

489.0

490.5

0.406

370.5

372.0

0.606

430.5

432.0

0.093

490.5

492.0

0.886

372.0

373.5

3.310

432.0

433.5

0.040

492.0

493.5

0.310

373.5

375.0

0.537

433.5

435.0

0.178

493.5

495.0

0.173

375.0

376.5

0.180

435.0

436.5

0.562

495.0

496.5

1.080

376.5

378.0

0.415

436.5

438.0

0.914

496.5

498.0

0.192

378.0

379.5

0.449

438.0

439.5

1.770

498.0

499.5

0.645

379.5

381.0

0.372

439.5

441.0

1.330

499.5

501.0

0.683

381.0

382.5

0.294

441.0

442.5

1.110

382.5

384.0

0.268

442.5

444.0

1.230

384.0

385.5

0.133

444.0

445.5

0.036

385.5

387.0

0.062

445.5

447.0

0.186

387.0

388.5

0.116

447.0

448.5

0.733

388.5

390.0

0.268

448.5

450.0

1.330

390.0

391.5

0.834

450.0

451.5

1.130

391.5

393.0

0.266

451.5

453.0

0.964

393.0

394.5

0.155

453.0

454.5

0.652

394.5

396.0

0.075

454.5

456.0

0.618

396.0

397.5

0.168

456.0

457.5

0.424

397.5

399.0

0.579

457.5

459.0

0.692

399.0

400.5

1.380

459.0

460.5

0.717

400.5

402.0

0.970

460.5

462.0

0.923

402.0

403.5

0.387

462.0

463.5

0.432

403.5

405.0

0.323

463.5

465.0

0.376

405.0

406.5

0.150

465.0

466.5

0.622

406.5

408.0

0.172

466.5

468.0

0.519

408.0

409.5

1.910

468.0

469.5

0.007

409.5

411.0

0.273

469.5

471.0

0.098

411.0

412.5

0.399

471.0

472.5

0.078

412.5

414.0

0.366

472.5

474.0

0.171

414.0

415.5

0.153

474.0

475.5

0.272

415.5

417.0

0.112

475.5

477.0

0.248

417.0

418.5

0.007

477.0

478.5

0.077

418.5

420.0

0.041

478.5

480.0

0.212

MRE Reconciliation

Reconciliation of drill results to date for the Bench Target relative to the 2026 MRE model suggest an overall grade increase relative to model-predicted grades. Figure 3.0 presents a summary of model-predicted grades compared to actual drilled grade for the eight (8) infill holes completed to date. All eight holes post-date the 2026 MRE model and therefore can be compared directly to model-predicted grades to measure the predictive accuracy of the model.

The results indicate significant variation on a hole-by-hole basis, ranging from a low of -38% (TM26-214) to a high of 100% (TM26-210). This is typical and within expected tolerances. On a weighted average basis, the comparison suggests that actual drilled grades are ~10% higher than the predicted modeled grade.

Similar results are observed for the project to date drilling which includes the exploration holes completed at the UV Target and the holes drilled along the eastern margin of the 2026 MRE optimized pit limit, targeting the large un-estimated portion of the model (Reference Figure 4.0). This data set also suggests that drilled grades are returning higher values than what is currently predicted by the 2026 MRE.

Both analyses exclude mineralization intersected outside the 2026 MRE model limit, specifically, the high-grade results intersected in holes TM26-210 and TM23-137X that extend beyond the base of the 2026 MRE model.

Figure 3.0 - Modelled Grade Versus Drilled Grade, Infill Drilling, 2026; Weighted by Interval Length

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/318446_figure3.jpg

Figure 4.0 - Modelled Grade Versus Drilled Grade, Exploration Drilling, 2026; Weighted by Interval Length

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/318446_figure4.jpg

Quality Assurance and Quality Control

Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts.

Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream. Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses.

Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider.

AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility.

Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction.

Qualified Person

Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101.

About the Tower Mountain Gold Property

The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex (" TMIC"). Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion representing approximately 25% of the TMIC halo.

The MRE has an effective date of January 19, 2026. A Technical Report titled "NI 43-101 Technical Report for the 2026 Mineral Resource Estimate on the Tower Mountain Project, Ontario, Canada." is available on the Company's website at www.thundergoldcorp.com and on SEDAR+ ( www.sedarplus.ca ) under the Company's Issuer profile.

The Report was prepared by Charley Murahwi, P.Geo., FAusIMM.; William Lewis, P.Geo., Tudorel Ciuculescu, P.Geo., and Richard Gowans, P.Eng., all of Micon International Limited (" Micon"), Toronto, Ontario, Canada. The Report was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and CIM Definition Standards of Mineral Resources and Mineral Reserves.

The MRE is summarized as follows:

Tower Mountain Mineral Resource Estimate - January 19, 2026

*

Category

Tonnage
(Mt)

Grade
(g/t Au)

Contained Metal
('000 oz gold)

*
*

Indicated

34.5

0.46

514

*
*

Inferred

211.1

0.45

3,053

*

Notes:

  1. The effective date of this MRE is January 19, 2026.

  2. Messrs. William Lewis, P.Geo., Charley Murahwi, P.Geo., FAusIMM, and Tudorel Ciuculescu, P.Geo. from Micon International Limited are the Qualified Persons (QPs) responsible for this MRE.

  3. The MRE has been classified in the Indicated and Inferred categories. At this time, there are no Measured resources at the Tower Mountain Project.

  4. The calculated gold cut-off grade is 0.19 g/t Au.

  5. An average specific gravity (SG) value of 2.77 g/cm3 was used.

  6. The MRE used economic assumptions for open pit mining. The following economic parameters were used for generating the cut-off grade: a gold price of US$3,000/oz, 80% recovery, open pit mining cost of US$3.0/t, processing costs of US$8.0/t, general and administration cost of US$3.5/t, transportation cost of US$2.5/oz of gold, and a royalty of 3%.

  7. The open pit used slope angles of 30° in overburden and 50° in fresh rock.

  8. The block model is orthogonal and has a parent block size of 5 m x 5 m x 5 m, with minimum sub-block size of 2.5 m x 2.5 m x 2.5 m.

  9. The open pit optimization used a re-blocked size of 10 m x 10 m x 10 m.

  10. The mineral resources described above have been prepared in accordance with the current Canadian Institute of Mining, Metallurgy and Petroleum Standards and Practices.

  11. Numbers have been rounded to the nearest million tonnes and nearest thousand ounces. Differences may occur in totals due to rounding.

  12. Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of reported Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration; however, it is reasonably expected that a significant portion of Inferred Mineral Resources could be upgraded into Indicated Mineral Resources with further exploration.

  13. Micon QPs have not identified any legal, political, environmental, or other relevant factors that could materially affect the potential development of the mineral resources and of the estimate.

The remaining 75% of the TMIC halo demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling.

A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling.

About Thunder Gold Corp.

Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. -- an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth.

At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada's mining industry.

For more information about the Company please visit: www.thundergoldcorp.com .

On behalf of the Board of Directors,
Wes Hanson, P.Geo., President and CEO

For further information contact:

Wes Hanson, CEO
(647) 202-7686
whanson@thundergoldcorp.com

Bryan Baritot, Investor Relations
IR@thundergoldcorp.com

NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking statements"). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including the Company's plans regarding exploring its mineral exploration properties; anticipated results of geophysical surveys, drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company's prospects, properties and business detailed elsewhere in the Company's disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management's estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company's expectations or projections.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/318446

Mobilize your Website
View Site in Mobile | Classic
Share by: