This article first appeared on GuruFocus .
-
EPRA EPS:Increased 5% year-on-year.
-
Rental Growth:Strong 2.8% growth.
-
Leasing Activity:255,000 square meters let or relet, with an average rental uplift of 16%.
-
Track27 Progress:95% of the EUR1.15 billion investment target secured, with over EUR800 million already invested.
-
Occupancy Rate:99.4% for the portfolio, outperforming the market by 500 basis points.
-
Rent Reversion:Average rental growth of 4% since 2022, with 7% of rent potential still to capture.
-
Cost of Debt:Maintained at a low 2.2% on average, below the 2.5% maximum guidance.
-
Debt Maturity:No debt maturing before 2028, with average maturity extended to 5.5 years.
-
Credit Rating:Fitch reaffirmed BBB+ investment-grade rating with a stable outlook; obtained a strong F1 short-term credit rating.
-
EPS Guidance:Reaffirmed 2026 and 2027 guidance, targeting 7% annual EPS growth and a 2027 EPS target of EUR5.60.
-
Warning! GuruFocus has detected 6 Warning Signs with XBRU:MONT.
-
Is XBRU:MONT fairly valued? Test your thesis with our free DCF calculator.
Release Date: August 21, 2026
For the complete transcript of the earnings call, please refer to the full earnings call transcript .
Positive Points
-
Montea NV ( XBRU:MONT ) reported a 5% year-on-year increase in EPRA EPS, underpinned by strong 2.8% rental growth.
-
Exceptional leasing momentum with 255,000 square meters let or relet, achieving an average rental uplift of 16%.
-
Track27 growth plan is 95% secured, with EUR1.15 billion investment target nearly reached and fully funded.
-
Portfolio occupancy remains near full at 99.4%, outperforming the market by 500 basis points.
-
Strategic land bank expanded to nearly 4 million square meters, with an additional 500,000 square meters under option in France.
-
Refinanced EUR207 million in funding, extending average debt maturity to 5.5 years with no maturities before 2028.
-
Fitch reaffirmed BBB+ investment-grade credit rating with stable outlook, and obtained first F1 short-term rating.
-
Cost of debt maintained at a low 2.2%, well below the 2.5% maximum guidance under Track27.
-
Strong development pipeline with 188,000 square meters under development, including pre-lets to major tenants like BSH and DP World.
-
Successful partnership with Weerts Group, delivering Skechers project phases and generating immediate positive earnings contribution.
Negative Points
-
EPRA EPS growth of 5% lags the 7% annual guidance, with the gap attributed to pending FBI recognition in the Netherlands.
-
Occupiers are taking longer to make leasing decisions due to geopolitical uncertainty, slowing the pace of deal closures.
-
Rising market vacancy rates (94-95%) contrast with Montea's high occupancy, indicating broader market challenges.
-
Development projects face planning and permitting delays, particularly in France, which could impact timelines.
-
Operational margin (EPRA cost ratio) has slightly declined due to increased investments in teams across countries.
-
The WDP-Argan merger could increase competitive pressures in the French market, though management downplays the impact.
-
Speculative developments are limited to 50% pre-let threshold, potentially constraining growth in uncertain markets.
-
Remaining Track27 investments (EUR90 million under execution, EUR180 million under negotiation) carry execution risk.
-
The 7% EPS growth target for 2027 depends on capturing reversionary potential and completing acquisitions at yields above 6.5%.
-
Land bank expansion in France requires securing permits, with only 150,000 square meters of 500,000 square meters committed so far.
Q & A Highlights
Q: Can you explain the bridge between the 5% EPRA EPS growth in the first half and the reaffirmed 7% annual growth guidance for 2026? A: Els Vervaecke (CFO) clarified that the 2% difference is due to the pending recognition of Montea's FBI (fiscal investment institution) status in the Netherlands for fiscal year 2024. This recognition is expected to contribute roughly EUR0.08, which accounts for the missing 2% growth.
Q: What changed most during the quarter that led to improved large-scale occupier demand, and how do you reconcile this with rising market vacancy? A: Jo De Wolf (CEO) stated that it is not about repricing, as evidenced by the 16% average rental uplift. The main change is that occupiers are finally looking through geopolitical uncertainty and making decisions after a period of delay. He emphasized a clear distinction between "A" product (sustainable, prime locations) and "B" product, noting that demand remains strong for high-quality assets like Montea's, which explains the 99.4% occupancy versus the market average of 94.5%.
Q: Does the WDP-Argan combination change your perspective on the French market and increase competitive pressure? A: Jo De Wolf (CEO) said the merger does not change the dynamics for Montea, as they were already competing with both companies separately. He highlighted that Montea has the largest land bank relative to its portfolio size in the European market, which positions the company well to continue its growth plans independently of the competitive landscape changes.
Q: Can you provide more color on the progress of the four acquisitions announced in Q1 and whether their closing is included in the 2026 EPS guidance? A: Inna Maslova (IR Manager) confirmed that the EUR90 million acquisition pipeline is progressing, with the EUR18 million bpost acquisition in Brussels already closed in June. The remaining EUR70 million is in final closing stages, expected to complete at an average yield above 6.5%. These acquisitions will feed directly into earnings towards the end of this year and next.
Q: Can we expect more speculative development starts going forward, given you have started some small ones? A: Jo De Wolf (CEO) reaffirmed that Montea's strategy remains unchanged: developments will only start with at least a 50% pre-let. The current Tiel project is 70% pre-let, and the company has a strong track record of leasing out entire buildings before delivery. Els Vervaecke (CFO) added that the overall pre-let level for developments in execution stands at 92%.
Q: Is the goal of securing 500,000 square meters of committed land in France by end of 2027 still realistic, and is planning the main constraint? A: Jo De Wolf (CEO) confirmed the target is on track, noting that planning and permitting are the main challenges but that Montea has visibility on obtaining permits. He highlighted a strategic advantage: much of the land in France is acquired subject to obtaining permits, meaning the company does not have to invest in the land beforehand. Inna Maslova (IR Manager) added that 150,000 square meters of GLA is already secured.
Q: Your operational margin or EPRA cost ratio has been coming down. How comfortable are you in reaching the 90% operational margin target for 2027? A: Els Vervaecke (CFO) explained that the slight decline is due to investments in teams across different countries to support growth. She noted that Montea's cost ratio remains in the top 10 of the EPRA universe with the highest occupancy rates, and the 90% operating margin target for 2027 is reaffirmed.
Q: Once occupiers make a decision, do they have the patience to wait for space, or do they want it as soon as possible? A: Jo De Wolf (CEO) explained that logistics projects have a short throughput time of 9 to 12 months once permits are obtained, which is not a reason for speculative development. He noted that different tenants have different timelinesJD.com will start immediately, while BSH can waitand that processes like the DP World tender are managed with awareness of the 12 to 18-month timeline.
For the complete transcript of the earnings call, please refer to the full earnings call transcript .
