Brookfield Elementary Capital Project
Information about the Renovations and Additions
The Brookfield Elementary School project was identified as part of the 2008 Renovation Queue, which was approved by the Fairfax County School Board (FCSB) in 2009. Brookfield Elementary ranks 47th out of 63 schools on the list. Planning and design efforts for the renovation were funded through the 2021 School Bond Referendum, with construction funding provided by the 2023 School Bond Referendum.
Upon completion, the project will modernize and reimagine the existing school building, providing updated learning environments and fully upgraded mechanical, electrical, and plumbing systems. The renovation will also expand the school by approximately 34,500 square feet, featuring a partial addition to the administrative offices, transforming the current gymnasium into a new library, and constructing a new, larger gymnasium addition. Included in the addition, are 2-story classroom wing, expanded cafeteria, and updated main entrance.
Site improvements will enhance both safety and functionality, including updates to the bus loop, an extended Kiss & Ride area, new playgrounds, and expanded outdoor classroom spaces. Once completed, Brookfield Elementary School will total approximately 126,200 Gross Square Feet and will be designed to meet the Virginia Collaborative for High Performance Schools (CHPS) Designed certification standards, supporting a healthy, sustainable, and energy-efficient learning environment.
We appreciate your patience and support as we work to improve our school facilities. Stay tuned for more updates.
Latest Update: November 13, 2025
Construction Information
Construction continues to move forward with exciting progress throughout the school.
- 10-Classroom Addition
The new 10-classroom addition, which includes resource spaces, workrooms, conference rooms, and new main electrical and communication rooms at the western end of the existing building, is progressing steadily. This addition encloses the formerly open end of the building, significantly improving circulation within the facility. - Underslab work has been completed.
- The first-floor slab has been poured.
- Construction of the CMU exterior walls is underway.
- Conduits for the new electrical service are fully installed in the new electrical room.
- Site Improvements
- The retaining wall at the end of the future basketball court is complete.
- Stormwater management structures 1 and 2 have been installed and completed.
- The expanded teacher parking lot has been constructed and is now complete.
-
Demolition: Interior demolition has begun in classrooms on both the first and second floors at the west end of the existing school building.
-
Mechanical, Electrical, and Plumbing (MEP) Updates: Upgrades to building systems are underway, with new electrical, domestic water, and sanitary lines installed and connected in the classrooms at the front and rear.
- Phased Occupied Building: Students and Construction activities and workers are separated.
- New Classrooms
- Renovated Classrooms
- Sustainability Improvements: The renovation will feature a more sustainable building with all LED lighting and advanced lighting controls.
- HVAC System: A new, more efficient HVAC system with updated controls will enhance comfort and energy efficiency.
- Technology Upgrades: We are incorporating updated technology to support modern learning environments.
- Life Safety Upgrades: New fire alarm system, new security system, fire sprinkler system, and new generator.
- Water Conservation: Automatic low-flow sinks, toilets, and urinals will be installed to promote water conservation.
- Daylighting: New windows and improved natural lighting in classrooms and gymnasium.
- Kitchen and Expanded cafeteria: All new kitchen equipment and expanded cafeteria.
- Relocated and Improved: SACC, Library, music, and art.
- Various site improvements:
- New pre-K playground
- New school-age playground
- New outdoor basketball courts
- Improved kiss and ride circulation
- Additional parking
Future Events
Information on future engagement opportunities will be posted as soon as they are planned.
For updates, join the FCPS News You Choose subscription for this project. Once signed up or logged in, choose the Capital Projects (School Construction) and the school's construction topic.
Key Build Information
Funding: 2021 Bond (Planning/Design), 2023 Bond (Construction)
Future Building Area: 122,600 SF
Anticipated Future Capacity: 1000
Building Area: 88,324 SF
Acreage:13.00
Prior Renovation: 1986
Prior Capacity Enhancement:1998
Renovation Queue Rank: #47
Architect: Quinn Evans
Contractor: HESS Construction
Current Status: Under Construction
Start of Construction: January 2025
Estimated Completion: August 2027
School Information
Address: 4200 Lees Corner Road, Chantilly, VA 20151
FCPS Region: 5
Grades: PreK-6
HS Pyramid: Chantilly HS
MS Feeder: Franklin MS, Rocky Run MS
Opened: 1967
Title 1: Yes
K-3 Cap: 24
Programs: PreK, AAP Local Level IV, Foreign Language in the Elementary School, SACC (2 classrooms)
Past Planning & Construction Information
February 27, 2025: Community Meeting
October 4, 2023:Fairfax County Planning Commission Meeting
July 17, 2023 7:00 p.m.: Sully District Land Use Committee Meeting
March 16, 2023, 6:30-7:30 p.m.: Community Meeting
March 7, 2023, 7:00 p.m.: Facilities Planning Advisory Council (FPAC) meeting.
September 22, 2022: Design Feedback and Engagement Committee, meeting #2
May 26, 2022: Design Feedback and Engagement Committee, meeting #1